{"id":2777,"date":"2024-09-23T09:30:23","date_gmt":"2024-09-23T09:30:23","guid":{"rendered":"https:\/\/leonsolarmount.com\/?p=2777"},"modified":"2024-09-24T03:52:32","modified_gmt":"2024-09-24T03:52:32","slug":"3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net","status":"publish","type":"post","link":"https:\/\/leonsolarmount.com\/th\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/","title":{"rendered":"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net"},"content":{"rendered":"<p class=\"has-medium-font-size\"><a href=\"http:\/\/c1848780708xtx.scd.hkwezhan.cn\/\">North Star Solar Power Net News<\/a>: Germany added new in July, according to the latest data from the federal network agency Bundesnetzagentur<a target=\"_blank\" href=\"https:\/\/guangfu.bjx.com.cn\/zt.asp?topic=%b9%e2%b7%fc%d7%b0%bb%fa%c1%bf\" rel=\"noreferrer noopener\">The amount of photovoltaic equipment is<\/a>434.96MW,<\/p><p class=\"has-medium-font-size\">Among them, the roof solar energy project is 308.8 trillion watts, the ground installation project under 750 kilowatts is 10.2 trillion watts, the total volume of the door solar power project is slightly lower than 1.9 trillion watts, and the other ground installation projects are 126 trillion watts. The new load capacity of solar power projects in the seven months prior to 2021 was 3.2GW, and by the end of July, the cumulative solar power capacity in this country reached 55.7GW.<\/p><p class=\"has-medium-font-size\"><strong>Germany Solar Power Equipment (WM) Monthly 2021<\/strong><\/p><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"http:\/\/nwzimg.wezhan.net\/contents\/sitefiles3604\/18020544\/images\/4866375.png\" alt=\"%E5%9B%BE%E7%89%8719.2.png\" title=\"%E5%9B%BE%E7%89%8719.2.png\"\/><\/figure><p class=\"has-medium-font-size\"><strong>Data source: bundesnetzagentur<\/strong><\/p><p class=\"has-medium-font-size\">According to one draft law, Germany is set to raise the capacity of photovoltaic generators from 100GW to 150GW by 2030, at the same time the German cabinet has approved a new &#8220;climate protection law,&#8221; carbon emissions fell 65 percent at 1990 levels by 2030, when carbon neutralization is scheduled to be realized by 2045, exceeding the previous 55 percent reduction target.<\/p><p class=\"has-medium-font-size\">The German Solar Energy Industry Association (BSW-Solar) points out that the commercial roof photovoltaic project market is currently in a bad economy. The commercial roof photovoltaic project is a roof project with an output of between 30 and 750 kilowatts. From May to July of this year, the installed volume of the commercial roof photovoltaic project is only 287 trillion watts from May to July 2020. The loading capacity of these projects was 477 trillion watts, down about 40 percent compared to the previous year.<\/p><p class=\"has-medium-font-size\">The Bundesnetzagentur also announced new compensation standards for September. For photovoltaic projects with a capacity of 100 kilowatts or less of residential buildings, sound-proof barriers and buildings, electricity prices are between 5.51 and 7.25 cents\/kilowatts. For solar power of 100 kilowatts or more, pay 4.97 cents\/kilowatt-hour electricity.<\/p><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"http:\/\/nwzimg.wezhan.net\/contents\/sitefiles3604\/18020544\/images\/4866377.png\" alt=\"%E5%9B%BE%E7%89%8729.2.png\" title=\"%E5%9B%BE%E7%89%8729.2.png\"\/><\/figure><p class=\"has-medium-font-size\"><strong>Data source: bundesnetzagentur<\/strong><\/p><p class=\"has-medium-font-size\"><strong>Status of bid recruitment project<\/strong><\/p><p class=\"has-medium-font-size\">Germany&#8217;s EEG Solar has launched three bids this year. Among them, the project of the ground power plant is two times in total, and the project of the solar energy roof is one. At the end of this year, a 616MW ground power plant project and a 150MW solar energy roof project will be tendered, bringing the total tender volume to 2.15GW this year.<\/p><p class=\"has-medium-font-size\"><strong>Germany 2021 photovoltaic project tender status<\/strong><\/p><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"http:\/\/nwzimg.wezhan.net\/contents\/sitefiles3604\/18020544\/images\/4866379.png\" alt=\"%E5%9B%BE%E7%89%8739.3.png\" title=\"%E5%9B%BE%E7%89%8739.3.png\"\/><\/figure><p class=\"has-medium-font-size\"><strong>Data source: bundesnetzagentur<\/strong><\/p><p class=\"has-medium-font-size\">In 2022, Germany<a target=\"_blank\" href=\"https:\/\/guangfu.bjx.com.cn\/zt.asp?topic=%b9%e2%b7%fc%b7%a2%b5%e7\" rel=\"noreferrer noopener\">Solar power<\/a>The bid volume of increased to 6GW from the previous 1.9GW. In addition, the levy of the EEG (Renewable Energy Act) will also stabilize in 2023 and 2024, funding it in the federal budget, reaching a high of 5 cents per kilowatt.<\/p><p class=\"has-medium-font-size\"><strong>Germany completes cumulative bid volume by 2015-2021<\/strong><\/p><figure class=\"wp-block-image\"><img decoding=\"async\" src=\"http:\/\/nwzimg.wezhan.net\/contents\/sitefiles3604\/18020544\/images\/4866381.png\" alt=\"%E5%9B%BE%E7%89%8749.4.png\" title=\"%E5%9B%BE%E7%89%8749.4.png\"\/><\/figure><p class=\"has-medium-font-size\"><strong>Data source: bundesnetzagentur<\/strong><\/p><p class=\"has-medium-font-size\">Email address: chenchen_bjxmail.com (turn # to @)<\/p><p class=\"has-medium-font-size\">Polar Star Photovoltaic Net Statement: We will reprint this information from the affiliated media of the Polar Star Power Network or other websites of the Internet. The polar star photovoltaic grid carries this sentence, for the purpose of communicating more information, does not mean that certifying or not buying into that point of view. The content of the sentence is for reference.<\/p><p class=\"has-medium-font-size\">Hot spot attention<\/p><figure class=\"wp-block-image\"><a href=\"https:\/\/guangfu.bjx.com.cn\/special\/?id=1173969\"><img decoding=\"async\" src=\"http:\/\/nwzimg.wezhan.net\/contents\/sitefiles3604\/18020544\/images\/4866380.png\" alt=\"\u80fd\u6e90\u5c40\u65b0\u7248\u4e24\u4e2a\u7ec6\u5219\u5f81\u6c42\u610f\u89c1\uff1a\u65b0\u80fd\u6e90\u573a\u7ad9\u9700\u5177\u5907\u4e00\u6b21\u8c03\u9891\u80fd\u529b\"\/><\/a><\/figure><h2 class=\"wp-block-heading\"><a href=\"https:\/\/guangfu.bjx.com.cn\/special\/?id=1173969\">The two bylaws of the new edition of the Energy Department ask for an opinion.<\/a><\/h2><p class=\"has-medium-font-size\">&#8220;Net connection operation management provisions of net connection principals&#8221; applies to net connection principals such as thermal power, hydropower, nuclear power, wind power, solar power, pumped-up energy storage, and new energy storage directly arranged by provincial and above power planning organizations. adjustable loads that can respond to power scheduling mechanism directives at or above the saving level (including adjustable loads that aggregate in the form of aggregators, virtual power plants, etc.), A network entity of conditional participation that can be planned indirectly through its own power plant and municipal and power planning mechanism below.<\/p><p><a href=\"https:\/\/guangfu.bjx.com.cn\/special\/?id=1173969\">&#8212; More<\/a><\/p><p class=\"has-medium-font-size\">Exhibition of corporate wind<\/p><ul class=\"wp-block-list\"><li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20191101\/1017947.shtml\">The skilful transport of small power plants: do you really know your power plants?<\/a>2019-11-01<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190528\/982971.shtml\">We look forward to your date with guest Sanas SNEC2019!<\/a>2019-05-28<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190516\/980801.shtml\">Advancing to a new record in haulage service! Sanath has advanced across the board to Changji Shanxi 250mw Guangfu Lead Runner Base.<\/a>2019-05-16<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190506\/978722.shtml\">We can generate electricity efficiently only with scientific control.<\/a>2019-05-06<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190506\/978675.shtml\">Photovoltaic plant equipment maintenance these must be remembered<\/a>2019-05-06<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190506\/978663.shtml\">The award punishment was grounded and Sanas&#8217; first quarter team evaluation results were announced.<\/a>2019-05-06<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190505\/978466.shtml\">Laminated Tiles Quad Core Countless in the World of People Winning Meet<\/a>2019-05-05<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190325\/970854.shtml\">Mesh management, the new philosophy of the transport dimension of optical power plants, creates real post-operating value<\/a>2019-03-25<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20190115\/956798.shtml\">Sanath was selected as a service brand in Shandong Province.<\/a>2019-01-15<\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20181210\/947770.shtml\">King&#8217;s Glory: Akira Fuyuan Prize won a hundred-plus renewable energy<\/a>2018-12-10<\/li><\/ul><ul id=\"con_newxx_1\" class=\"wp-block-list\"><li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174761.shtml\">Two big profits are new courses; Karen Stocks Lead Polymer Roof to Apply New Scene<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174629.shtml\">Zhongli Group: Shaanxi Xuyang County About 400mw County Roofing Dispersion Photovoltaic Project Concluded<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174568.shtml\">Guangfu 1.4gw, Fengden 1gw Gansu Zhang City has started competitive placement for landscape projects.<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174585.shtml\">125MW! Jiangsu&#8217;s largest rooftop distributed solar power project contract ceremony was held at the inn<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174599.shtml\">Shock &#8220;Super Mirror Power Station&#8221; has come! Comparable to Sf movies! 1 year or nearly 200 million degrees of generation<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174801.shtml\">Dongfang Niszeng: Xie Jian resigned Sun Yue.<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174723.shtml\">Special Substation: Design production capacity of new special energy Xinjiang polycrystalline silicon production line is 6.6 million tons\/year<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174769.shtml\">Five billion! China Decoding Distributed Photovoltaic First Unsecured Loan<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174771.shtml\">Three-year average market share is nearly half; domestic electrode boiler maker breaks and stands<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174752.shtml\">One-week hearing review of the polar star solar grid (:30-9.3)<\/a><\/li><\/ul><p class=\"has-medium-font-size\">Latest News<\/p><ul class=\"wp-block-list\"><li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174805.shtml\">Nomination Meeting _ First Guangfu Building Integration and Innovation Development Forum<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174801.shtml\">Dongfang Nissho: Xie Jian resigned Sun Yue.<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174793.shtml\">The price of silicon chip with increased terminal demand is gradually stable (September 3, 2021)<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174769.shtml\">Five billion! China Decoding Distributed Photovoltaic First Unsecured Loan<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174752.shtml\">One-week hearing review of the polar star solar grid (:30-9.3)<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174723.shtml\">Special Substation: Design production capacity of new special energy Xinjiang polycrystalline silicon production line is 6.6 million tons\/year<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174720.shtml\">US: Add 9.9GW of wind power, solar energy and battery storage capacity in first half<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174696.shtml\">Changshu Power and Gangnam Group contracted to develop Changshu Rooftop Dispersion Photovoltaic Project<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174692.shtml\">The Jintai Power New Energy Company plans to increase its capital and expand its shares to acquire 100 percent shares in the three Guangfu Enterprises.<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174678.shtml\">Google to invest 1 billion euros in clean energy and digital infrastructure in Germany<\/a><\/li><\/ul><p class=\"has-medium-font-size\">Related Themes<\/p><figure class=\"wp-block-image\"><a href=\"https:\/\/guangfu.bjx.com.cn\/live\/2021zxfbsgf\/\"><img decoding=\"async\" src=\"http:\/\/nwzimg.wezhan.net\/contents\/sitefiles3604\/18020544\/images\/4866393.jpeg\" alt=\"\" title=\"\u201c\u6574\u53bf\u63a8\u8fdb\u201d\u5206\u5e03\u5f0f\u5149\u4f0f\u653f\u7b56\u6c47\u603b\"\/><\/a><\/figure><ul class=\"wp-block-list\"><li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174769.shtml\">Five billion! China Decoding Distributed Photovoltaic First Unsecured Loan<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174696.shtml\">Changshu Power and Gangnam Group contracted to develop Changshu Rooftop Dispersion Photovoltaic Project<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174650.shtml\">Huaneng Gansu Corporation has signed strategic alliance talks with Gansu Provincial Construction and Investment Group.<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174639.shtml\">The power supply of sunlight will climb to CCTV, and the whole prefecture will promote the solution of the whole scene.<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20210903\/1174629.shtml\">Zhongli Group: Shaanxi Xuyang County About 400mw County Roofing Dispersion Photovoltaic Project Concluded<\/a><\/li><\/ul><figure class=\"wp-block-image\"><a href=\"https:\/\/guangfu.bjx.com.cn\/live\/2020SNEC\/\"><img decoding=\"async\" src=\"http:\/\/nwzimg.wezhan.net\/contents\/sitefiles3604\/18020544\/images\/4866397.jpeg\" alt=\"\" title=\"2021\u5e74SNEC\u5149\u4f0f\u5c55\u4f1a\u7cbe\u5f69\u56de\u987e\"\/><\/a><\/figure><ul class=\"wp-block-list\"><li><a href=\"https:\/\/news.bjx.com.cn\/html\/20130816\/453322.shtml\">Complex to build solar power plant to realize some power supply (Fig)<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20130609\/439308.shtml\">Zhejiang Yongsheng New Energy Construction Bid Postponement Notice Form<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20130524\/436189.shtml\">Tao Ying Electric Preparedness Joins BatteryChina 2013 Exhibition<\/a><\/li>\n\n<li><a href=\"https:\/\/guangfu.bjx.com.cn\/news\/20130401\/426003.shtml\">Respect win-win to create value.<\/a><\/li>\n\n<li><a href=\"https:\/\/news.bjx.com.cn\/html\/20130304\/420414.shtml\">Salvation or Revolution &#8212; energy<\/a><\/li><\/ul>","protected":false},"excerpt":{"rendered":"<p>North Star Solar Power Net News: Germany added new in July, according to the latest data from the federal network agency BundesnetzagenturThe amount of photovoltaic equipment is434.96MW, Among them, the roof solar energy project is 308.8 trillion watts, the ground installation project under 750 kilowatts is 10.2 trillion watts, the total volume of the door [&hellip;]<\/p>","protected":false},"author":1,"featured_media":2783,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1,92],"tags":[174,173,176,172,171,170],"class_list":["post-2777","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-news","category-policy","tag-commercial-roof","tag-mini-rail","tag-residential-rooftop","tag-roof-brackets-system","tag-roof-mounting-system","tag-roof-pv-system"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.3 (Yoast SEO v23.8) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/leonsolarmount.com\/th\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/\" \/>\n<meta property=\"og:locale\" content=\"th_TH\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net\" \/>\n<meta property=\"og:description\" content=\"North Star Solar Power Net News: Germany added new in July, according to the latest data from the federal network agency BundesnetzagenturThe amount of photovoltaic equipment is434.96MW, Among them, the roof solar energy project is 308.8 trillion watts, the ground installation project under 750 kilowatts is 10.2 trillion watts, the total volume of the door [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/leonsolarmount.com\/th\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100091002557296\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-23T09:30:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-24T03:52:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"chentiandong25@gmail.com\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"chentiandong25@gmail.com\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 \u0e19\u0e32\u0e17\u0e35\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/\"},\"author\":{\"name\":\"chentiandong25@gmail.com\",\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#\/schema\/person\/aafd43905f64b7703119dd0327964ec8\"},\"headline\":\"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net\",\"datePublished\":\"2024-09-23T09:30:23+00:00\",\"dateModified\":\"2024-09-24T03:52:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/\"},\"wordCount\":1149,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#organization\"},\"image\":{\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg\",\"keywords\":[\"Commercial Roof\",\"Mini rail\",\"Residential Rooftop\",\"ROOF BRACKETS SYSTEM\",\"ROOF MOUNTING SYSTEM\",\"ROOF PV SYSTEM\"],\"articleSection\":[\"News\",\"Policy\"],\"inLanguage\":\"th\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/\",\"url\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/\",\"name\":\"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net\",\"isPartOf\":{\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg\",\"datePublished\":\"2024-09-23T09:30:23+00:00\",\"dateModified\":\"2024-09-24T03:52:32+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#breadcrumb\"},\"inLanguage\":\"th\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"th\",\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage\",\"url\":\"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg\",\"contentUrl\":\"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg\",\"width\":750,\"height\":500,\"caption\":\"In this picture, under the blue sky and white clouds, there is a red tile roof. The house is surrounded by lush green trees, presenting a vibrant and lively scene. Installed with eco-friendly photovoltaic panels, it generates green energy and provides the residents with fresher air.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\/\/leonsolarmount.com\/ru\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#website\",\"url\":\"https:\/\/leonsolarmount.com\/ru\/\",\"name\":\"Leon Solar Mount\",\"description\":\"ground mount system,tin roof mount system,tie roof mount system,floating pv system,solar pv Accessories\",\"publisher\":{\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/leonsolarmount.com\/ru\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"th\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#organization\",\"name\":\"Xiamen Leon Solar Technology Co., Ltd\",\"url\":\"https:\/\/leonsolarmount.com\/ru\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"th\",\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/leon-solar-company-logo-250-250.png\",\"contentUrl\":\"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/leon-solar-company-logo-250-250.png\",\"width\":1044,\"height\":720,\"caption\":\"Xiamen Leon Solar Technology Co., Ltd\"},\"image\":{\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100091002557296\",\"https:\/\/www.linkedin.com\/company\/xiamen-leon-solar-technology-corporation\/?viewAsMember=true\",\"https:\/\/www.youtube.com\/@xiecindy2767\",\"https:\/\/www.instagram.com\/leonsolarcindy\/\"],\"foundingDate\":\"2018-11-05\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"1\",\"maxValue\":\"10\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#\/schema\/person\/aafd43905f64b7703119dd0327964ec8\",\"name\":\"chentiandong25@gmail.com\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"th\",\"@id\":\"https:\/\/leonsolarmount.com\/ru\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ce2093256a3bd155a57aad87734e3844?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ce2093256a3bd155a57aad87734e3844?s=96&d=mm&r=g\",\"caption\":\"chentiandong25@gmail.com\"},\"sameAs\":[\"http:\/\/www.leonsolarmount.com\"],\"url\":\"https:\/\/leonsolarmount.com\/th\/author\/chentiandong25gmail-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/leonsolarmount.com\/th\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/","og_locale":"th_TH","og_type":"article","og_title":"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net","og_description":"North Star Solar Power Net News: Germany added new in July, according to the latest data from the federal network agency BundesnetzagenturThe amount of photovoltaic equipment is434.96MW, Among them, the roof solar energy project is 308.8 trillion watts, the ground installation project under 750 kilowatts is 10.2 trillion watts, the total volume of the door [&hellip;]","og_url":"https:\/\/leonsolarmount.com\/th\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100091002557296","article_published_time":"2024-09-23T09:30:23+00:00","article_modified_time":"2024-09-24T03:52:32+00:00","og_image":[{"width":750,"height":500,"url":"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg","type":"image\/jpeg"}],"author":"chentiandong25@gmail.com","twitter_card":"summary_large_image","twitter_misc":{"Written by":"chentiandong25@gmail.com","Est. reading time":"6 \u0e19\u0e32\u0e17\u0e35"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#article","isPartOf":{"@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/"},"author":{"name":"chentiandong25@gmail.com","@id":"https:\/\/leonsolarmount.com\/ru\/#\/schema\/person\/aafd43905f64b7703119dd0327964ec8"},"headline":"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net","datePublished":"2024-09-23T09:30:23+00:00","dateModified":"2024-09-24T03:52:32+00:00","mainEntityOfPage":{"@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/"},"wordCount":1149,"commentCount":0,"publisher":{"@id":"https:\/\/leonsolarmount.com\/ru\/#organization"},"image":{"@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage"},"thumbnailUrl":"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg","keywords":["Commercial Roof","Mini rail","Residential Rooftop","ROOF BRACKETS SYSTEM","ROOF MOUNTING SYSTEM","ROOF PV SYSTEM"],"articleSection":["News","Policy"],"inLanguage":"th","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/","url":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/","name":"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net","isPartOf":{"@id":"https:\/\/leonsolarmount.com\/ru\/#website"},"primaryImageOfPage":{"@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage"},"image":{"@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage"},"thumbnailUrl":"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg","datePublished":"2024-09-23T09:30:23+00:00","dateModified":"2024-09-24T03:52:32+00:00","breadcrumb":{"@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#breadcrumb"},"inLanguage":"th","potentialAction":[{"@type":"ReadAction","target":["https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/"]}]},{"@type":"ImageObject","inLanguage":"th","@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#primaryimage","url":"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg","contentUrl":"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/LEON-SOLAR-ROOF-PV-SYSTEM-PROJECT-NEWS-100.jpeg","width":750,"height":500,"caption":"In this picture, under the blue sky and white clouds, there is a red tile roof. The house is surrounded by lush green trees, presenting a vibrant and lively scene. Installed with eco-friendly photovoltaic panels, it generates green energy and provides the residents with fresher air."},{"@type":"BreadcrumbList","@id":"https:\/\/leonsolarmount.com\/3-2gw-with-cumulative-solar-generators-added-in-january-july-germany-north-star-solar-power-net\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/leonsolarmount.com\/ru\/"},{"@type":"ListItem","position":2,"name":"3.2gw with cumulative solar generators added in January-July Germany-North Star Solar Power Net"}]},{"@type":"WebSite","@id":"https:\/\/leonsolarmount.com\/ru\/#website","url":"https:\/\/leonsolarmount.com\/ru\/","name":"Leon Solar Mount","description":"ground mount system,tin roof mount system,tie roof mount system,floating pv system,solar pv Accessories","publisher":{"@id":"https:\/\/leonsolarmount.com\/ru\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/leonsolarmount.com\/ru\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"th"},{"@type":"Organization","@id":"https:\/\/leonsolarmount.com\/ru\/#organization","name":"Xiamen Leon Solar Technology Co., Ltd","url":"https:\/\/leonsolarmount.com\/ru\/","logo":{"@type":"ImageObject","inLanguage":"th","@id":"https:\/\/leonsolarmount.com\/ru\/#\/schema\/logo\/image\/","url":"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/leon-solar-company-logo-250-250.png","contentUrl":"https:\/\/leonsolarmount.com\/wp-content\/uploads\/2024\/09\/leon-solar-company-logo-250-250.png","width":1044,"height":720,"caption":"Xiamen Leon Solar Technology Co., Ltd"},"image":{"@id":"https:\/\/leonsolarmount.com\/ru\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100091002557296","https:\/\/www.linkedin.com\/company\/xiamen-leon-solar-technology-corporation\/?viewAsMember=true","https:\/\/www.youtube.com\/@xiecindy2767","https:\/\/www.instagram.com\/leonsolarcindy\/"],"foundingDate":"2018-11-05","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"1","maxValue":"10"}},{"@type":"Person","@id":"https:\/\/leonsolarmount.com\/ru\/#\/schema\/person\/aafd43905f64b7703119dd0327964ec8","name":"chentiandong25@gmail.com","image":{"@type":"ImageObject","inLanguage":"th","@id":"https:\/\/leonsolarmount.com\/ru\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/ce2093256a3bd155a57aad87734e3844?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ce2093256a3bd155a57aad87734e3844?s=96&d=mm&r=g","caption":"chentiandong25@gmail.com"},"sameAs":["http:\/\/www.leonsolarmount.com"],"url":"https:\/\/leonsolarmount.com\/th\/author\/chentiandong25gmail-com\/"}]}},"_links":{"self":[{"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/posts\/2777"}],"collection":[{"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/comments?post=2777"}],"version-history":[{"count":2,"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/posts\/2777\/revisions"}],"predecessor-version":[{"id":2784,"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/posts\/2777\/revisions\/2784"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/media\/2783"}],"wp:attachment":[{"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/media?parent=2777"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/categories?post=2777"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leonsolarmount.com\/th\/wp-json\/wp\/v2\/tags?post=2777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}